INSTALLED  GENERATING  CAPACITY  
FOR  STATE  SECTOR  PLANTS  AND  PRINCIPAL  CPPs  
Sl. Power Station [ownership] Installed Capacity Firm Power
No.   [MW] [MW]
  State Sector Plants    
[A] H Y D R O     
1 Hirakud,Burla [OHPC]
2 X 49.5    =   99               
 
  2 X 32.8       =   65.6      349.1 134
  3 X 37.5   = 112.5  
  Hirakud,Chiplima [OHPC] 3 X 24      =   72  
2 Balimela P.H.  [OHPC] 6 X 60      = 360 135
3 Rengali P.H.  [OHPC] 5 X 50      = 250 85.7
4 U.Kolab P.H. [OHPC] 4 X 80      = 320 95
5 Indravati P.H.[OHPC]
4 X 150    = 600 
224
6 Machhkund PH [OHPC] 3 X 17      =    51          57.375   40
   (Orissa share 50%) 3 X 21.25 =   63.75  
  TOTAL HYDRO:                    1936.475  
[B] T H E R M A L    
1 TTPS STAGE-I [NTPC] 4 X 60     =  240 151
2 TTPS STAGE-II [NTPC] 2 X 110   =  220 138
3 Ib Valley (I&II)   [OPGC] 2 X 210   =  420 300
  TOTAL THERMAL:                      880  
  TOTAL [A] + [B] 2816.475 1302.7
[C] Principal CPPs   Type
1 NALCO, Angul 8 X 120   =  960 Thermal
2 NALCO, Damanjodi
3 X 18.5  =    55.5
Thermal
3 Rourkela Steel Plant 2 X 60     =  120  
  5 X 25      = 125         248 Thermal
  1 X 3        =      3  
4 ICCL , CHOUDWAR 2 X 54      = 108 Thermal
5 HPCL [INDAL],HIRAKUD 1 X 67.5   =   67.5        267.5 Thermal
  2 X 100    = 200           Thermal
6 FACOR,BHADRAK 2 X 10.5   =   21 Diesel
7 ISPAT ALLOYS,BALASORE                       40.46 Diesel
8 KMCL(NINL)  DUBURI 2 X 19.25  =  38.5 Thermal
9 N.B.F.A, MERAMUNDALI 1 X  30       =  30 Thermal
10 BHUSAN STEEL
1 X 60        =  60          100
Thermal
  1 X 40        =  40 Thermal
11 OSWAL (PARADEEP) 2 X 55 =       110 Thermal
12 PPL (PARADEEP)                          38 Steam Diesel
13 Others                         46.388  
  TOTAL [CPP] 2063.348  
       
  G.TOTAL : [A] + [B] + [C] 4879.823  
           
ORISSA SHARE OF POWER FROM CENTRAL SECTOR GENERATING STATIONS IN ER AND CHUKHA HEP                                                                                                                    (As on 01.01.2007 )
SL. No. POWER STATION INSTALLED CAPACITY IN MW ORISSA SHARE OF INSTALLED CAPACITY  FIRM POWER IN MW ( AT 80 % TARGET AVAILABILTY )                                                                                                                              (Aux. Consumption= 10%)
SHARE IN %  SHARE IN MW        (at 100 % availability).
1 FARAKKA      (WEST BENGAL) (Aux - 7.5625%) 3 X 200 =  600      2 X 500 =1000 13.63% 218.0 157.0
2 KAHALGAON  (BIHAR)  (Aux - 9%) 4 X 210 =  840 15.24% 128.0 92.0
3 TSTPP, KANIHA  STAGE - I(ORISSA) (Aux - 7.5%) 2 X 500 = 1000     31.8% 318.0 229.0
4 TSTPP, KANIHA    STAGE - II    (ORISSA)  4 X 500 = 2000     NIL - -
  TOTAL  NTPC     664.0 478.0
5 CHUKHA (BHUTAN) 4 X 84 = 336                                      (270 MW considered for calculating India Share) 15.19% 41.0 30.0*
8 TALA (BHUTAN) 4 X 170 = 680 4.25% 29.0  
   * GRIDCO has got a share of 15.19% of actual receipt of Birapada (India), which works out to be 30 MW average on daily basis.