| INSTALLED GENERATING
CAPACITY |
|
|
|
|
|
|
|
|
|
|
|
| FOR STATE
SECTOR PLANTS AND
PRINCIPAL CPPs |
|
|
| Sl. |
Power Station [ownership] |
Installed Capacity |
Firm Power |
|
| No. |
|
[MW] |
[MW] |
|
| |
State Sector Plants |
|
|
|
| [A] |
H Y D R O |
|
|
|
|
| 1 |
Hirakud,Burla [OHPC] |
|
|
|
| |
|
2 X 32.8 = 65.6
349.1 |
134 |
|
| |
|
3 X 37.5 = 112.5 |
|
|
| |
Hirakud,Chiplima [OHPC] |
3 X 24 = 72 |
|
|
| 2 |
Balimela P.H. [OHPC] |
6 X 60 = 360 |
135 |
|
| 3 |
Rengali P.H. [OHPC] |
5 X 50 = 250 |
85.7 |
|
| 4 |
U.Kolab P.H. [OHPC] |
4 X 80 = 320 |
95 |
|
| 5 |
Indravati P.H.[OHPC] |
|
224 |
|
| 6 |
Machhkund PH [OHPC] |
3 X 17 =
51 57.375 |
40 |
|
| |
(Orissa share 50%) |
3 X 21.25 = 63.75 |
|
|
| |
TOTAL HYDRO: |
1936.475 |
|
|
| [B] |
T H E R M A L |
|
|
|
| 1 |
TTPS STAGE-I [NTPC] |
4 X 60 = 240 |
151 |
|
| 2 |
TTPS STAGE-II [NTPC] |
2 X 110 = 220 |
138 |
|
| 3 |
Ib Valley (I&II)
[OPGC] |
2 X 210 = 420 |
300 |
|
| |
TOTAL THERMAL: |
880 |
|
|
| |
TOTAL [A] + [B] |
2816.475 |
1302.7 |
|
| [C] |
Principal CPPs |
|
Type |
|
| 1 |
NALCO, Angul |
8 X 120 = 960 |
Thermal |
|
| 2 |
NALCO, Damanjodi |
|
Thermal |
|
| 3 |
Rourkela Steel Plant |
2 X 60 = 120 |
|
|
| |
|
5 X 25 = 125 248 |
Thermal |
|
| |
|
1 X 3 = 3 |
|
|
| 4 |
ICCL , CHOUDWAR |
2 X 54 = 108 |
Thermal |
|
| 5 |
HPCL [INDAL],HIRAKUD |
1 X 67.5 = 67.5
267.5 |
Thermal |
|
| |
|
2 X 100 = 200 |
Thermal |
|
| 6 |
FACOR,BHADRAK |
2 X 10.5 = 21 |
Diesel |
|
| 7 |
ISPAT ALLOYS,BALASORE |
40.46 |
Diesel |
|
| 8 |
KMCL(NINL) DUBURI |
2 X 19.25 = 38.5 |
Thermal |
|
| 9 |
N.B.F.A, MERAMUNDALI |
1 X 30 =
30 |
Thermal |
|
| 10 |
BHUSAN STEEL |
|
Thermal |
|
| |
|
1 X 40 = 40 |
Thermal |
|
| 11 |
OSWAL (PARADEEP) |
2 X 55 = 110 |
Thermal |
|
| 12 |
PPL (PARADEEP) |
38 |
Steam Diesel |
|
| 13 |
Others |
46.388 |
|
|
| |
TOTAL [CPP] |
2063.348 |
|
|
| |
|
|
|
|
|
|
| |
G.TOTAL : [A] + [B] + [C] |
4879.823 |
|
|
| |
|
|
|
|
|
|
|
ORISSA SHARE OF POWER
FROM CENTRAL SECTOR GENERATING STATIONS IN ER AND CHUKHA HEP
(As on 01.01.2007 ) |
|
|
|
|
|
|
|
| SL. No. |
POWER STATION |
INSTALLED CAPACITY IN MW |
ORISSA SHARE OF INSTALLED
CAPACITY |
FIRM POWER IN MW ( AT 80 % TARGET AVAILABILTY )
(Aux. Consumption= 10%) |
|
| SHARE IN % |
SHARE
IN MW (at 100 % availability). |
|
| 1 |
FARAKKA (WEST BENGAL) (Aux - 7.5625%) |
3
X 200 = 600 2 X 500 =1000 |
13.63% |
218.0 |
157.0 |
|
| 2 |
KAHALGAON (BIHAR)
(Aux - 9%) |
4
X 210 = 840 |
15.24% |
128.0 |
92.0 |
|
| 3 |
TSTPP,
KANIHA STAGE - I(ORISSA) (Aux - 7.5%) |
2 X 500 = 1000 |
31.8% |
318.0 |
229.0 |
|
| 4 |
TSTPP, KANIHA STAGE - II (ORISSA) |
4 X 500 = 2000 |
NIL |
- |
- |
|
| |
TOTAL NTPC |
|
|
664.0 |
478.0 |
|
| 5 |
CHUKHA
(BHUTAN) |
4
X 84 = 336 (270 MW
considered for calculating India Share) |
15.19% |
41.0 |
30.0* |
|
| 8 |
TALA
(BHUTAN) |
4
X 170 = 680 |
4.25% |
29.0 |
|
|
| |
* GRIDCO has got a share of 15.19% of actual
receipt of Birapada (India), which works out to be 30 MW average on daily
basis. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|