| No. |
Description |
Annual tariff as claimed by PGCIL(Rs Cr.) |
Annual tariff considered in application (Rs Cr.) |
Remarks (CERC Order & date) |
| A |
Regional Transmission System |
|
|
|
| 1 |
Farakka Transmission System |
34.815 |
34.815 |
CERC order dated 18.07.2006 |
| 2 |
Kahalgaon Transmission system |
22.792 |
22.792 |
CERC order dated 14.12.2005 |
| 3 |
Jeypore-Talcher transmission System |
14.366 |
14.366 |
CERC order dated 14.09.2005 |
| 4 |
Talcher transmission System |
13.267 |
13.267 |
CERC order dated 02.02.2006 |
| 5 |
Chukha transmission System |
27.447 |
27.447 |
CERC order dated 21.12.2005 |
| 6 |
Rangit-Melli & Rangit-Raman (Rangit transmission system) |
2.408 |
2.408 |
CERC order dated 25.01.2006 |
| 7 |
Rangit-Siliguri (Rangit transmission system) |
3.741 |
3.741 |
CERC order dated 25.01.2006 |
| 8 |
Dehri-Karmanasa line & bays (DOC 01.06.99) |
2.176 |
2.176 |
CERC order dated 12.01.2006 |
| 9 |
Hathidah River Crossing (DOC 01.03.2001) |
1.318 |
1.318 |
CERC order dated 10.02.2006 |
| 10 |
50MVA Transformer at Malda (wef 01.10.01) |
0.943 |
0.943 |
CERC order dated 23.11.2005 |
| 11 |
63MVA reactor at Rengali (wef 01.06.2000) |
0.347 |
0.347 |
CERC order dated 02.09.2005 |
| 12 |
2nd Jamshedpur-Rourkela Line (ER-PAT) (DOC 01.01.03) |
9.094 |
9.094 |
CERC order dated 04.05.2006 |
| 13 |
Sregenthening of Farakka-Maldam (01.05.02 ) |
1.981 |
1.981 |
CERC order dated 20.01.2006 |
| 14 |
ICT at Jayepore (01.10.02 ) |
1.644 |
1.644 |
CERC order dated 27.01.2006 |
| 15 |
LILO of Bong-Malda at Siliguri (01.08.03 ) |
9.030 |
9.030 |
CERC order dated 04.05.2006 |
| 16 |
LILO of Purnia-Dalkhola at Purnia (01.11.03 ) |
2.110 |
2.110 |
CERC order dated 29.06.2006 |
| 17 |
LILO of Bong-Malda at Purnia (01.11.03 ) |
14.199 |
14.199 |
CERC order dt.13.02.2007 |
| 18 |
400KV D/C Talcher - Meramundali line (01.12.03) |
6.126 |
6.126 |
CERC order dt.10.01.2007 |
| 19 |
3rd Transformer at Bihar Sariff (01.04.04) |
2.034 |
2.034 |
CERC order dt.09.05.2006 |
| 20 |
Meramundali- Jeypore line (01.01.04) |
24.468 |
24.468 |
CERC order dt.06.02.2007 |
| 21 |
2nd Kahalgaon-Biharshariff |
19.489 |
19.489 |
CERC order dt.06.02.2007 |
| 22 |
Bihar Grid stregnthening scheme except ICT at BSF (Provisional) |
18.866 |
18.866 |
CERC order dt.09.05.2006 |
| 23 |
Lilo of Klgh-Rngl 400 kv S/C Line at Baripada |
9.863 |
9.863 |
CERC order dt.24.08.2006 |
| 24 |
Lilo of Slg-Gang . Sec. 132 kV rang-Slg Line at Melli(Provisional) |
0.921 |
0.921 |
CERC order dt.21.09.2006 |
| 25 |
Lilo of 1 Ckt. Slg-Rangit Line at Gangtok (01.10.2005) |
9.315 |
9.315 |
CERC order dt.21.11.2006 |
| 26 |
40 % Fixed Series Compensation on Exst. 400 kV S/C Rengali-Indravati TL of ER 01.10.2005 |
2.407 |
2.407 |
CERC order dt.15.12.2006 |
| 27 |
400 kV Slg-Prn , Prn-Muzff & 220 kV (PGCIL) -MZFF(BSEB) TL 01.09.2006 (Provisional) |
90.852 |
90.852 |
CERC order dt.16.01.2007 |
| 28 |
400 kV SLG & PRN S/S (EXT>), 440% FSC & TCSC of PRN - Muzgg 400 kV DC TL at PRN(01.05.06) (Provisional) |
15.750 |
15.750 |
CERC order dt.29.01.2007 |
| 29 |
400/220 kV 315 MVA ICT at PRN (01.06.06)(Provisional) |
1.745 |
1.745 |
CERC order dt.29.01.2007 |
| 30 |
4000/220 kV MUZ. S/S (NEW) (EXCL. 2 Nos. 400 kV Bays ,Line, Reactor,ICT-II) 220 kV Muz. S/S (BSEB-Kanti ) Extn. (01.09.06) (Provisional) |
8.831 |
8.831 |
CERC order dt.29.01.2007 |
| 31 |
400 kV D/C at Tala (Indo-Bhutan Border ) Silguri TL (01.10.2005) (Provisional) |
16.381 |
16.381 |
CERC order dt.06.02.2007 |
| 32 |
Lilo of 2nd Ckt. Of Bong-Mld 400 kv D/c Transmission line, SLG & PRN S/S (01.05.2006) (Provisional) |
17.586 |
17.586 |
CERC order dt.06.02.2007 |
| 33 |
2nd 315(3x105) MVA , 400/220 kV trans. At Indravati (OHPC) Switchyard in ER. (Provisional) |
2.284 |
2.284 |
CERC order dt.26.04.2007 |
| |
Total Transmission Charges (Regional System) |
408.594 |
408.594 |
|
| |
GRIDCO's Share |
|
|
|
| B |
Inter-Regional Transmission System |
|
|
|
| 1 |
Rourkela-Raipur Line(ER PART 01.04.03 ) |
10.376 |
10.376 |
CERC order dt. 09.05.2006 |
| 2 |
Budhipadar-Korba line |
1.434 |
1.434 |
CERC order dt.16.03.2006 |
| 3 |
Jeypore-Gazuwaka line & S/S at Gazuwaka (ER portion) (DOC 01.09.99) |
27.023 |
27.023 |
CERC order dt.07.06.2006 |
| 4 |
Malda-Bongaingaon line (ER portion) (DOC 01.04.2000) |
20.973 |
20.973 |
CERC order dt 14.01.2006 |
| 5 |
Biharsariff-Sasarm-Saranath line (DOC 01.07.2001) |
11.368 |
11.368 |
CERC order dt 25.01.2006 |
| 6 |
HVDC back to back station at sasaram (DOC 01.12.02) |
25.691 |
25.691 |
CERC order dt. 09.05.2006 |
| 7 |
HVDC back to back station (Pole-II) at Gajuwaka (1.3.05) |
23.570 |
23.570 |
CERC order dt. 23.10.2006 |
| 8 |
400 kV Muzz-Gorakhpur TL (01.09.2006)(Provisional) |
26.899 |
26.899 |
CERC order dt. 16.01.2007 |
| 9. A. |
TCSC at Gorakhpur for both Circuit DOCO: 01.09.2006(Provisional) |
6.006 |
6.006 |
CERC order dt. 16.01.2007 |
| B. |
2 Nos. Bays at Muzff(01.09.06)(Provisional) |
1.572 |
1.572 |
CERC order dt. 16.01.2007 |
| |
Total Inter Regional Charges |
154.912 |
154.912 |
|
| |
Annual Tariff |
563.506 |
563.506 |
|
| |
Monthly Tariff |
46.959 |
46.959 |
|
| Year-end adjustments of PGCIL transmission charges |
|
|
|
|
| |
ITEM |
Claimed by PGCIL |
Considered by Gridco (Rs. in Crore) |
|
| |
A. Incentive |
|
|
|
| |
FY 2005-06 |
1.871 |
|
|
| |
FY 2006-07 |
2.28 |
|
|
| |
Proposed for FY 2008-09 |
|
2.28 |
|
| |
B. Income Tax |
|
|
|
| |
FY 2005-06 |
0.84 |
|
|
| |
FY 2006-07 |
3.05 |
|
|
| |
Proposed for FY 2008-09 |
|
3.05 |
|
| |
C. AMC for special type Meters |
|
|
|
| |
Approved for FY 2007-08 |
0.01 |
|
|
| |
Proposed for FY 2008-09 |
|
0.01 |
|
| |
D. FERV & Interest paid for Foreign Currency Loan |
|
|
|
| |
Incurred during FY 2007-08 |
3.52 |
|
|
| |
Proposed for FY 2008-09 |
|
1 |
|
| |
Total Year End Charges proposed for FY 2008-09 |
0.00 |
6.34 |
|
| |
Total Annual charges (including year end adjustment for 07-08 ) |
|
569.85 |
|
| |
Monthly charges (including year end adjustment for 07-08) |
|
47.487 |
|
| |
Gridco's Share from Regional Transmission System(%) |
18.36% |
75.02 |
|
| |
GRDCO Share from Inter Regional System ( %) |
26.13% |
40.48 |
|
| |
Gridco share towards Year end charges |
|
6.34 |
|
| |
ULDC charges |
|
14.13 |
|
| |
Total Annual Transmission charges payable by Gridco for CTS |
|
135.97 |
|
| |
less: allocable to short term customers |
|
11 |
|
| |
Net amount payable by Gridco towards transmission charges |
|
124.97 |
|
|
Energy drawal by Gridco (MU) |
|
5803 |
|
|
Per unit PGCIL transmission charges (in paise) |
|
21.54 |
|
|
Transmission Loss (%) |
|
3.62% |
|
|
Per unit PGCIL transmission charge, including central transmission loss (in paise) |
22.34 |
|
| |
|
|
|
|
| No. |
Description |
Annual tariff as claimed by PGCIL(Rs Cr.) |
Annual tariff considered in application (Rs Cr.) |
Remarks (CERC Order & date) |
|
|
|
|
| A |
Regional Transmission System |
|
|
|
|
|
|
|
| 1 |
Farakka Transmission System |
38.058 |
38.058 |
CERC order dated 07.02.2008 |
|
|
38.058 |
3805.77 |
| 2 |
Kahalgaon Transmission system |
25.101 |
25.101 |
CERC order dated 07.02.2008 |
|
|
25.101 |
2510.11 |
| 3 |
Jeypore-Talcher transmission System |
15.349 |
15.349 |
CERC order dated 31.03.2008 |
|
|
15.349 |
1534.87 |
| 4 |
Talcher transmission System |
14.648 |
14.648 |
CERC order dated 31.03.2008 |
|
|
14.648 |
1464.76 |
| 5 |
Chukha transmission System |
29.819 |
29.819 |
CERC order dated 31.03.2008 |
|
|
29.819 |
2981.86 |
| 6 |
Rangit-Melli & Rangit-Raman (Rangit transmission system) |
2.408 |
2.408 |
CERC order dated 25.01.2006 |
|
|
2.408 |
240.82 |
| 7 |
Rangit-Siliguri (Rangit transmission system) |
3.741 |
3.741 |
CERC order dated 25.01.2006 |
|
|
3.741 |
374.12 |
| 8 |
Dehri-Karmanasa line & bays (DOC 01.06.99) |
2.176 |
2.176 |
CERC order dated 12.01.2006 |
|
|
2.176 |
217.63 |
| 9 |
Hathidah River Crossing (DOC 01.03.2001) |
1.318 |
1.318 |
CERC order dated 10.02.2006 |
|
|
1.318 |
131.76 |
| 10 |
50MVA Transformer at Malda (wef 01.10.01) |
0.943 |
0.943 |
CERC order dated 23.11.2005 |
|
|
0.943 |
94.27 |
| 11 |
63MVA reactor at Rengali (wef 01.06.2000) |
0.347 |
0.347 |
CERC order dated 02.09.2005 |
|
|
0.347 |
34.66 |
| 12 |
2nd Jamshedpur-Rourkela Line (ER-PAT) (DOC 01.01.03) |
9.094 |
9.094 |
CERC order dated 04.05.2006 |
|
|
9.094 |
909.38 |
| 13 |
Sregenthening of Farakka-Maldam (01.05.02 ) |
1.981 |
1.981 |
CERC order dated 20.01.2006 |
|
|
1.981 |
198.05 |
| 14 |
ICT at Jayepore (01.10.02 ) |
1.644 |
1.644 |
CERC order dated 27.01.2006 |
|
|
1.644 |
164.43 |
| 15 |
LILO of Bong-Malda at Siliguri (01.08.03 ) |
9.030 |
9.030 |
CERC order dated 04.05.2006 |
|
|
9.030 |
903.03 |
| 16 |
LILO of Purnia-Dalkhola at Purnia (01.11.03 ) |
2.110 |
2.110 |
CERC order dated 29.04.2008 |
|
|
2.110 |
210.98 |
| 17 |
LILO of Bong-Malda at Purnia (01.11.03 ) |
14.199 |
14.199 |
CERC order dt.13.02.2007 |
|
|
14.199 |
1419.91 |
| 18 |
400KV D/C Talcher - Meramundali line (01.12.03) |
6.126 |
6.126 |
CERC order dt.10.01.2007 |
|
|
6.126 |
612.56 |
| 19 |
3rd Transformer at Bihar Sariff (01.04.04) |
2.097 |
2.097 |
CERC order dt.23.05.2008 |
|
|
2.097 |
209.66 |
| 20 |
Meramundali- Jeypore line (01.01.04) |
24.468 |
24.468 |
CERC order dt.06.02.2007 |
|
|
24.468 |
2446.82 |
| 21 |
2nd Kahalgaon-Biharshariff |
19.489 |
19.489 |
CERC order dt.06.02.2007 |
|
|
19.489 |
1948.93 |
| 22 |
Bihar Grid stregnthening scheme except ICT at BSF (Provisional) |
24.348 |
24.348 |
CERC order dt.23.05.2008 |
|
|
24.348 |
2434.75 |
| 23 |
Lilo of Klgh-Rngl 400 kv S/C Line at Baripada |
9.863 |
9.863 |
CERC order dt.15.10.2007 |
|
|
9.863 |
986.29 |
| 24 |
Lilo of Slg-Gang . Sec. 132 kV rang-Slg Line at Melli(Provisional) |
1.120 |
1.120 |
CERC order dt.15.02.2008 |
|
|
1.120 |
111.97 |
| 25 |
Lilo of 1 Ckt. Slg-Rangit Line at Gangtok (01.10.2005) |
9.315 |
9.315 |
CERC order dt.15.10.2007 |
|
|
9.315 |
931.47 |
| 26 |
40 % Fixed Series Compensation on Exst. 400 kV S/C Rengali-Indravati TL of ER 01.10.2005 |
2.407 |
2.407 |
CERC order dt.15.10.2007 |
|
|
2.407 |
240.68 |
| 27 |
400 kV Slg-Prn , Prn-Muzff & 220 kV (PGCIL) -MZFF(BSEB) TL 01.09.2006 (Provisional) |
121.255 |
121.255 |
CERC order dt.28.04.2008 |
|
|
###### |
12125.47 |
| 28 |
400 kV SLG & PRN S/S (EXT>), 440% FSC & TCSC of PRN - Muzgg 400 kV DC TL at PRN(01.05.06) (Provisional) |
16.388 |
16.388 |
CERC order dt.23.05.2008 |
|
|
16.388 |
1638.82 |
| 29 |
400/220 kV 315 MVA ICT at PRN (01.06.06)(Provisional) |
1.830 |
1.830 |
CERC order dt.23.05.2008 |
|
|
1.830 |
183.04 |
| 30 |
4000/220 kV MUZ. S/S (NEW) (EXCL. 2 Nos. 400 kV Bays ,Line, Reactor,ICT-II) 220 kV Muz. S/S (BSEB-Kanti ) Extn. (01.09.06) (Provisional) |
9.836 |
9.836 |
CERC order dt.23.05.2008 |
|
|
9.836 |
983.61 |
| 31 |
400 kV D/C at Tala (Indo-Bhutan Border ) Silguri TL (01.10.2005) (Provisional) |
21.412 |
21.412 |
CERC order dt.23.05.2008 |
|
|
21.412 |
2141.19 |
| 32 |
Lilo of 2nd Ckt. Of Bong-Mld 400 kv D/c Transmission line, SLG & PRN S/S (01.05.2006) (Provisional) |
22.614 |
22.614 |
CERC order dt.23.05.2008 |
|
|
22.614 |
2261.35 |
| 33 |
2nd 315(3x105) MVA , 400/220 kV trans. At Indravati (OHPC) Switchyard in ER. (Provisional) |
2.304 |
2.304 |
CERC order dt.26.04.2007 |
|
|
2.304 |
230.37 |
| 34 |
New Siliguri-Malda (Provisional) |
17.059 |
17.059 |
CERC order dt.24.09.2007 |
|
|
17.059 |
1705.89 |
| 35 |
400/220KV,315 MVA ICT-II at Muz (Prorata)(Provisional) |
2.300 |
2.300 |
CERC order dt.06.01.2008 |
|
|
2.300 |
230.03 |
| 36 |
400KV D/C Kahl - Pat Trans. line (INCL 1X50 MVAR)(Provisional) |
52.756 |
52.756 |
CERC order dt.25.02.2008 |
|
|
52.756 |
5275.56 |
| 37 |
400KV D/C Maith-Ranchi TL (315 MVA ICT-II)(Provisional) |
32.088 |
32.088 |
CERC order dt.25.02.2008 |
|
|
32.088 |
3208.81 |
| 38 |
LILO of 1 Ckt. of 400KV Farakka-Jeerat Line at Subhashgram DOCO:01.03.2007 |
15.385 |
15.385 |
CERC order dt.01.05.2008 |
|
|
15.385 |
1538.51 |
| 39 |
315MVA 400/220KV ICT-I at Subhashgram DOCO:01.04.2007 |
2.281 |
2.281 |
CERC order dt.01.05.2008 |
|
|
2.281 |
228.05 |
| 40 |
315MVA ICT at Siliguri |
1.874 |
1.874 |
CERC order dt.06.05.2008 |
|
|
1.874 |
187.38 |
| 41 |
400KV D/C BSF-MZP TL Extn. of BSF &MZP |
23.447 |
23.447 |
CERC order dt.06.05.2008 |
|
|
23.447 |
2344.7 |
| 42 |
40%SR Compen MRMDL-Jey,400KV S/C at Jey |
2.498 |
2.498 |
CERC order dt.19.05.2008 |
|
|
2.498 |
249.8 |
| 43 |
Feeder-I of 400KV D/C Teesta(Stage-V) Siliguri Trans Sys Assoc. with Teesta(Stage-V) HEP(Provisional) |
22.284 |
22.284 |
CERC order dt.11.06.2008 |
|
|
22.284 |
2228.41 |
| 44 |
80MVAR Bus React. &2Nos.220KV line bay at Ranchi(Provisional) |
2.818 |
2.818 |
CERC order dt.23.05.2008 |
|
|
2.818 |
281.79 |
| 45 |
ICT-I at Patna Substation(Provisional) |
1.401 |
1.401 |
CERC order dt.23.05.2008 |
|
|
1.401 |
140.08 |
| 46 |
400/220KV ICT-I at Ranchi S/S alongwith assoc. bays & 2Nos. Line bays at Patna S/S under Kahalgaon Stage-II,Phase-I,Trans Sys in ER(Provisional) |
4.019 |
4.019 |
CERC order dt.23.05.2008 |
|
|
4.019 |
401.88 |
| 47 |
ICT-II at Patna S/S alongwith assoc.bays(Provisional) |
2.806 |
2.806 |
CERC order dt.18.09.2008 |
|
|
2.806 |
280.61 |
| |
Total Transmission Charges (Regional System) |
649.849 |
649.849 |
|
|
|
###### |
64984.89 |
| |
GRIDCO's Share |
|
|
|
|
|
|
|
| B |
Inter-Regional Transmission System |
|
|
|
|
|
|
|
| 4 |
Bongaingaon - New Siliguri line (DOC 01.04.2000)(Provisional) |
12.444 |
12.444 |
CERC order dt 14.01.2006 |
|
|
|
|
| |
Total Inter Regional Charges |
12.444 |
12.444 |
|
|
|
|
|
| |
Annual Tariff |
662.293 |
662.293 |
|
|
|
|
|
| |
Monthly Tariff |
55.191 |
55.191 |
|
|
|
|
|
| Year-end adjustments of PGCIL transmission charges |
|
|
|
|
|
|
|
|
| |
ITEM |
Claimed by PGCIL |
Considered by Gridco for Fy 2009-10 (Rs. in Crore) |
|
|
|
|
|
|
|
|
|
| |
A. Incentive |
|
|
|
|
|
|
|
| |
FY 2006-07 |
0.089 |
0.089 |
|
|
|
|
|
| |
FY 2007-08 |
4.53 |
4.53 |
|
|
|
|
|
| |
Proposed for FY 2009-10 |
4.62 |
4.62 |
|
|
|
|
|
| |
B. Income Tax |
|
|
|
|
|
|
|
| |
FY 2006-07 |
|
|
|
|
|
|
|
| |
FY 2007-08 |
2.53 |
2.53 |
|
|
|
|
|
| |
Proposed for FY 2009-10 |
2.53 |
2.53 |
|
|
|
|
|
| |
C. AMC for special type Meters |
|
|
|
|
|
|
|
| |
Approved for FY 2007-08 |
|
|
|
|
|
|
|
| |
Proposed for FY 2008-09 |
|
|
|
|
|
|
|
| |
D. FERV & Interest paid for Foreign Currency Loan & Floating rate of Interest |
|
|
|
|
|
|
|
| |
Incurred during FY 2007-08 |
3.21 |
3.21 |
|
|
|
|
|
| |
Proposed for FY 2009-10 |
3.21 |
3.21 |
|
|
|
|
|
| |
Total Year End Charges proposed for FY 2009-10 |
10.36 |
10.36 |
|
|
|
|
|
| |
Total Annual charges (including year end adjustment for 07-08 ) |
|
672.65 |
|
|
|
|
|
|
Monthly charges (including year end adjustment for 07-08) |
|
56.054 |
|
|
|
|
|
|
Gridco's Share from Regional Transmission System(%) |
15.53% |
100.93 |
|
|
|
|
|
|
GRDCO Share from Inter Regional System ( %) |
23.50% |
2.92 |
|
|
|
|
|
|
Gridco share towards Year end charges |
|
10.36 |
|
|
|
|
|
|
ULDC charges |
|
14.19 |
|
|
|
|
|
|
Total Annual Transmission charges payable by Gridco for CTS |
|
128.40 |
|
|
|
|
|
|
less: allocable to short term customers |
|
4.50 |
|
|
|
|
|
|
Net amount payable by Gridco towards transmission charges |
|
123.91 |
|
|
|
|
|
|
Energy drawal by Gridco (MU) |
|
6414 |
|
|
|
|
|
|
Per unit PGCIL transmission charges (in paise) |
|
19.32 |
|
|
|
|
|
|
Transmission Loss (%) |
|
3.88% |
|
|
|
|
|
|
Per unit PGCIL transmission charge, including central transmission loss (in paise) |
20.10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|