| What's New || Related Link || Site Map || F.A.Q. || Contact Us |
s/a1.htm" onMouseOut="MM_swapImgRestore()" onMouseOver="MM_swapImage('a6','','../test/cus1.jpg',1)">
   
Vision & Mission
="a3.htm" style="color:rgb(255,255,255)">GRIDCO Profile
Core Objectives
• Power Reform
Electricity Sector
Orissa Power Scenario
} function MM_swapImage() { //v3.0 var i,j=0,x,a=MM_swapImage.arguments; document.MM_sr=new Array; for(i=0;i<(a.length-2);i+=3) if ((x=MM_findObj(a[i]))!=null){document.MM_sr[j++]=x; if(!x.oSrc) x.oSrc=x.src; x.src=a[i+2];} } //-->
 
<<BACK
THE ORISSA ELECTRICITY REFORM ACT, 1995

THE ORISSA ELECTRICITY REFORM ACT, enacted on 10th January, 1996 by the state after obtaining prior presidential assent. The Act came into effect on 1st April 1996, with an objective to provide for the restructuring of the electricity industry for the rationalisation of the generation, transmission, distribution and supply of electricity for avenues for participation of private sector entreprenuers in the electricity industry and generally for taking measures conducive to the development } function MM_swapImage() { //v3.0 var i,j=0,x,a=MM_swapImage.arguments; document.MM_sr=new Array; for(i=0;i<(a.length-2);i+=3) if ((x=MM_findObj(a[i]))!=null){document.MM_sr[j++]=x; if(!x.oSrc) x.oSrc=x.src; x.src=a[i+2];} } //-->

and management of the electricity industry in the state in an efficient, econonmic and competitive manner including the constitution of an electricity regulatory commission for the state and for matters connected therewith of incidental thereto."

 

 

 

 


* Last Modified on 15th December '03
<<BACK
 
ight="26" valign="middle"> © 2003, GRIDCO Limited (A govt. of Orissa Undertaking)(Formerly Grid Corporation of Orissa Limited), Reg. Off.- Janpath, BBSR - 751022. ™ ® all rights reserved. | Disclaimer
Site Powered By : Addsoft Technologies Pvt. Ltd.
HOME