AVAILABILITY OF POWER FROM EXISTING STATIONS IN ORISSA                
  Name of developer Installed Capacity
(MW)
% Share 2006-'07 2007-'08 2008-'09 2009-'10 2010-'11 2011-'12 2012-'13 2013-'14 2014-'15
A. STATE SECTOR                      
  OHPC                      
(i) Burla Power House 275.5 100% 275.5 275.5 275.5 275.5 275.5 275.5 275.5 275.5 275.5
(ii) Chiplima Power House 72 100% 72 72 72 72 72 72 72 72 72
(iii) Balimela Power House 360 100% 360 360 360 360 360 360 360 360 360
(iv) Rengali Power House 250 100% 250 250 250 250 250 250 250 250 250
(v) Upper Kolab Power House 320 100% 320 320 320 320 320 320 320 320 320
(vi) Upper Indravati Hydro Electric Project 600 100% 600 600 600 600 600 600 600 600 600
(vii) Machhkund Power House 114.75 50% 57.375 57.375 57.375 57.375 57.375 57.375 57.375 57.375 57.375
  OPGC                      
(i) Ib Thermal Power Station 420 100% 420 420 420 420 420 420 420 420 420
B. CENTRAL SECTOR                      
  NTPC                      
(i) Farakka Super Thermal Power Station 1600 13.625% 218 218 218 218 218 218 218 218 218
(ii) Kahalgaon Super Thermal Power Station 840 15.238% 127.9992 127.9992 127.9992 127.9992 127.9992 127.9992 127.9992 127.9992 127.9992
(iii) Talcher Super Thermal Power Station 1000 31.800% 318 318 318 318 318 318 318 318 318
  PTC                      
(i) Chukha Hydro Power Corporation 270 15.19% 41.013 41.013 41.013 41.013 41.013 41.013 41.013 41.013 41.013
(ii) Tala Hydro Project 1020 4.25% 43.35 43.35 43.35 43.35 43.35 43.35 43.35 43.35 43.35
  NTPC (STATE DEDICATED)                      
(i) TTPS 460 100% 460 460 460 460 460 460 460 460 460
C. CPP                      
  M/s.ICCL Ltd.  108   10 10 10 10 10 10 10 10 10
  M/s.NALCO Ltd. 960   41 41 41 41 41 41 41 41 41
  M/s. Arti Steel Ltd. 19.95   6 6 6 6 6 6 6 6 6
  M/s. NINL 19.95   6 6 6 6 6 6 6 6 6
  TOTAL 8710.15   3626.237 3626.237 3626.237 3626.237 3626.237 3626.237 3626.237 3626.237 3626.237