NOTIFICATION
on Gridco's Prepaid System Studies
For
conducting System Studies, the perspective / existing
user(s) proposing to be connected / already connected
to the existing network (132 kV and above) shall submit
an application to Senior General Manager (Corporate
Planning). Only after acceptance of the application
by the Senior Genera Manager (Corporate Planning), the
user(s) shall deposit in advance a sum of Rs.35,000/-(Rupees
thirty five thousand) only towards the fee for conducting
System Studies comprising of Load Flow, Short circuit
and Electromechanical Transient (short term ) Stability
study as per the scope of study and terms & conditions
elucidated below.
The
requisite fee shall be deposited in shape of Bank Draft
drawn from any Nationalised Bank at Bhubaneswar payable
to the D.D.O, Gridco Head Qr's Office, Bhubaneswar.
The
user(s) shall furnish data in the prescribed format,
specified under Section 15 of OEGC and as per provision
of the software, to the Senior General Manager
(Corporate Planning), Gridco. The same shall be made
available from the O/o the Sr.G.M.(CP).
A
.Scope of Study:
- Load
Flow Study:
The
study shall be conducted under High or Low Hydro
with peak system loading condition or any one
of the user defined condition, acceptable to Gridco.
One contingency case study shall be conducted with the
above condition.
2.
Short Circuit Study:
The
study shall be conducted with three phase to ground
fault and single line to ground fault.
3.
Stability Study:
The Electromechanical (short term) stability study shall
be conducted with three outages, namely - outage of
one single generator, outage of one single circuit transmission
line.
B.
Terms and Conditions:
1.
The system studies covering Load Flow (3 phase a.c.),
Short Circuit and Electromechanical Transient (short
term) Stability shall be conducted as per the relevant
provision of OEGC and Transmission Planning Criteria.
2.
Two copies (one original & one photocopy) of the
study report shall be provided to the user(s). Subsequent
copies shall be obtained at an extra cost of Rs.500/-(Rupees
five hundred) only per copy.
3.
The study shall be completed within 60 working days
from the date of receipt of data in complete shape
and the results shall be submitted as per the provisions
in the software.
4.
The study shall be conducted as per the prevailing scenario
at that time. Any alteration / modification (in
connectivity/configuration) at a later date shall be
treated as a fresh study. The incidental changes , if
required towards consultancy for any specific conditions
other than the aforesaid conditions under the scope
of studies, shall be borne by the user(s).
5.
Gridco reserves the right to alter / change the fees
for the study and terms and conditions at a later date,
if required.
6.
This notification on Prepaid System Studies supercedes
the earlier notification No. SGM(PS)-PL-GC-38/2001/2642
dated 28.10.2002 of Sr.G.M (P.S).
CHAIRMAN-CUM-MANAGING
DIRECTOR |