ONGOING SCHEMES

 

Sl. No. Name of the Project Scope of work
Transmission Line Turnkey Project
1 400kV IB- Meramundali DC Line 235 km
2 220kV Budhipadar-Bolangir via Burla line 173 km
3 220kV Indravati-Therubali line 90 km
4 220kV Mendhasal-LILO Bhanjanagar/ Chandaka Line 6.22 km
5 220kV Mendhasal-Narendrapur/ Chandaka line 5km
6 220kV Duburi-Duburi 'Old' line 11.056 km
7 132kV Narendrapur-Chatrapur Line 13 Km
8 132kV Bidanasi-Cuttack line 12 KM
9 132kV Mancheswar-Badagada Line 13 Km
10 132kV Badagada-Uttara Line 12KM
11 132kV Uttara-Sijua Line 11 KM
12 132kV Bolangir'old'- Bolangir 'New' line 1.63 Km
13 132kV Hirakud LILO Chipilima/Bargarh Line 13 KM
14 132kV Hirakud- LILO Burla/sambalpur Line 8.5 Km
15 132kV Phulnakhara-LILO Mancheswar/ Cuttack Line 12.2 KM
16 132kV Meramundali-LILO Chainpal-Dhenkanal Choudwar Line Each 1.78 KM
Transmission Substation Turnkey Project
1 220 kV Ib (Extension) 220kV bays(7 nos.), 2x315MVA tr.
2 220/132 kV Bolangir (New) 220kV bays(6 nos.), 132kV bays(8 nos.), 33kV bays(5 nos), 2x100MVA, 1x12.5MVA tr.
3 400kV part of the 400/220/132kV Substation at Meramundali 400kV bays (11nos.), 220kV bays (2 nos.), 2x315MVA tr.
4 132/33 kV Boinda (New) 132kV bays(5 nos.), 33kV bays(9 nos.), 2x20MVA tr.
5 220/33 kV Rengali (Extension) 220kV bays(1 no.), 33kV bays(4 nos.), 1x20MVA tr.
6 Nayagarh 220/33kV Bay extension(Am2) 220kV bay (1 no.), 33kV bay (1 no.)
7 400/220 kV Substation at Mendhasal (New) 400kV bays(4 nos.), 220kV bays(14 nos.), 2x315MVA tr.
8 400/220kV Substation at Duburi (New) 400kV bays(4 nos.), 220kV bays(10 nos.), 2x315MVA tr.
9 132 kV Cuttack (Extension) 132kV bays(2 nos.)
10 220 kV Therubali (Extension) 220kV bays(2 nos.)
11 132/33 kV Badagada (New) 132kV bays(5 nos.), 33kV bays(9 nos.), 2x20MVA tr.
12 132 kV Sijua (Extension) 132kV bay(1 no.)
13 Balimela HP powerhouse (Extension) 220kV bays(1 no.), 33kV bays(2 nos.), 1x20MVA tr.
14 132/33 kV Phulnakhara (New) 132kV bays(5 nos.), 33kV bays(9 nos.), 2x20MVA tr.
15 33 kV Nayagarh (Extension) 33kV bays(3 nos.)
* 16 220/132/33 Budhipadar (Extension) 220kV bays(2 nos), 132kV bays(3 nos), 33kV bays(9 nos.), 1x12.5MVA tr.
** 17 220/132/33 kV Burla (New) 220kV bays(8 nos.), 132kV bays(9 nos.), 33kV bays(9 nos.), 2x100MVA and 2x20MVA tr.

* : Balance work except 2 nos. of already commissioned 132kV feeder bays.

** : Balance work except already commissioned 132/33kV portion of the Burla substation.

 

* Last Modified on 18th May'04