| Sl.
No. |
Name
of the Project |
Scope
of work |
| Transmission
Line Turnkey Project |
| 1 |
400kV
IB- Meramundali DC Line |
235
km |
| 2 |
220kV
Budhipadar-Bolangir via Burla line |
173
km |
| 3 |
220kV
Indravati-Therubali line |
90
km |
| 4 |
220kV
Mendhasal-LILO Bhanjanagar/ Chandaka Line |
6.22
km |
| 5 |
220kV
Mendhasal-Narendrapur/ Chandaka line |
5km |
| 6 |
220kV
Duburi-Duburi 'Old' line |
11.056
km |
| 7 |
132kV
Narendrapur-Chatrapur Line |
13
Km |
| 8 |
132kV
Bidanasi-Cuttack line |
12
KM |
| 9 |
132kV
Mancheswar-Badagada Line |
13
Km |
| 10 |
132kV
Badagada-Uttara Line |
12KM |
| 11 |
132kV
Uttara-Sijua Line |
11
KM |
| 12 |
132kV
Bolangir'old'- Bolangir 'New' line |
1.63
Km |
| 13 |
132kV
Hirakud LILO Chipilima/Bargarh Line |
13
KM |
| 14 |
132kV
Hirakud- LILO Burla/sambalpur Line |
8.5
Km |
| 15 |
132kV
Phulnakhara-LILO Mancheswar/ Cuttack Line |
12.2
KM |
| 16 |
132kV
Meramundali-LILO Chainpal-Dhenkanal Choudwar Line Each
|
1.78
KM |
| Transmission
Substation Turnkey Project |
| 1 |
220
kV Ib (Extension) |
220kV
bays(7 nos.), 2x315MVA tr. |
| 2 |
220/132
kV Bolangir (New) |
220kV
bays(6 nos.), 132kV bays(8 nos.), 33kV bays(5 nos), 2x100MVA,
1x12.5MVA tr. |
| 3 |
400kV
part of the 400/220/132kV Substation at Meramundali |
400kV
bays (11nos.), 220kV bays (2 nos.), 2x315MVA tr. |
| 4 |
132/33
kV Boinda (New) |
132kV
bays(5 nos.), 33kV bays(9 nos.), 2x20MVA tr. |
| 5 |
220/33
kV Rengali (Extension) |
220kV
bays(1 no.), 33kV bays(4 nos.), 1x20MVA tr. |
| 6 |
Nayagarh
220/33kV Bay extension(Am2) |
220kV
bay (1 no.), 33kV bay (1 no.) |
| 7 |
400/220
kV Substation at Mendhasal (New) |
400kV
bays(4 nos.), 220kV bays(14 nos.), 2x315MVA tr. |
| 8 |
400/220kV
Substation at Duburi (New) |
400kV
bays(4 nos.), 220kV bays(10 nos.), 2x315MVA tr. |
| 9 |
132
kV Cuttack (Extension) |
132kV
bays(2 nos.) |
| 10 |
220
kV Therubali (Extension) |
220kV
bays(2 nos.) |
| 11 |
132/33
kV Badagada (New) |
132kV
bays(5 nos.), 33kV bays(9 nos.), 2x20MVA tr. |
| 12 |
132
kV Sijua (Extension) |
132kV
bay(1 no.) |
| 13 |
Balimela
HP powerhouse (Extension) |
220kV
bays(1 no.), 33kV bays(2 nos.), 1x20MVA tr. |
| 14 |
132/33
kV Phulnakhara (New) |
132kV
bays(5 nos.), 33kV bays(9 nos.), 2x20MVA tr. |
| 15 |
33
kV Nayagarh (Extension) |
33kV
bays(3 nos.) |
| *
16 |
220/132/33
Budhipadar (Extension) |
220kV
bays(2 nos), 132kV bays(3 nos), 33kV bays(9 nos.), 1x12.5MVA
tr. |
| **
17 |
220/132/33
kV Burla (New) |
220kV
bays(8 nos.), 132kV bays(9 nos.), 33kV bays(9 nos.), 2x100MVA
and 2x20MVA tr. |