SYSTEM SUPPORT
Central Grid comprising of ER, NER and
WR was synchronized with NR on 26th August 2006.
After synchronization of ER-NR, the
frequency is remaining within lower side of the permissible band. In
fact many times frequency is dipping below 49.0Hz. During such hours
of distress, Gridco generally supports the system by injecting power
and thus system stability is being maintained.
|