Least
Cost Generation Plan (SPP:210):-
This Gridco document describes the Gridco internal procedure
and responsibilities for carrying out system studies to assist
in the preparation of the least Cost generation Plan.
The
objective of this internal procedure is to ensure that, all
required study work will be carried to enable a least cost
generation plan for the following 10 years to be prepared
in accordance with the Section 4.3.2 of the Grid Code and
Section 20.3 of the Licence.
|