System
Studies (SPP: 205):-
This document describes the Gridco internal procedures for
different studies necessary for the Grid system planning of
Orissa.
The objective of this internal procedure is to define the
responsibilities for the running and management of various
studies for the Grid system planning of Orissa, periodically,
to determine constraints on the transmission system, both
in terms of line overloads and reduced voltages, development
requirements for the future and occasionally, for post-fault
investigations. These studies shall ultimately include fault
levels, load flows, voltage levels and system stability.
|